Warehouse, factory and internal line marking
Warehouse and factory line marking keeps people, forklifts and stock where they should be. Clear walkways, crossings and racking lines make a busy floor safer and easier to run, whether it's a large logistics hub or a small storage unit.
We mark warehouse floors, factory floors, logistics and distribution centres, workshops and external yards that take constant traffic from forklifts, pallet trucks, lorries and people on foot. That covers internal line marking and warehouse line painting indoors, and line marking in the yard outside. The floor is prepared properly first, so the markings stay put. We work across Norfolk, Suffolk, Essex and Cambridgeshire, on sites of all sizes.
Want to know why we prepare every surface properly before marking? Read our principles.
Why do warehouse line markings matter?
- Safer floors: clear walkways, crossing points and vehicle routes cut the risk of accidents and help staff and visitors get around safely.
- Better use of space: marked loading zones, pallet bays and storage areas keep the floor organised and stop stock creeping into walkways.
- Compliance: meeting health and safety obligations (such as HSE guidance and fire escape routes) is easier with durable, visible markings.
- Durability: the right coating, such as a two-part epoxy, stands up to constant traffic, so you're not paying for repaints every year.
- A tidy floor: clean, sharp lines make a good impression on visitors and customers.
We'll talk you through the options and help you pick the system that suits your floor, your traffic and your budget.
Local pages: Warehouse line marking in Norfolk, Warehouse line marking in Suffolk, Warehouse line marking in Essex, Warehouse line marking in Cambridgeshire.
Our application method
Preparation decides how long a warehouse floor marking lasts. We grind or shot blast the concrete first, taking off oil, dust and old coatings, so the new system bonds to clean, keyed concrete.
Then we prime the floor and let it dry, apply the marking system in as many coats as it needs, and finish with a protective topcoat if your site needs one.
For warehouse environments, the main systems we recommend are:
- Single-part acrylic: quick to apply and dries fast between coats, giving you a well-protected surface with minimal disruption to a working warehouse.
- Two-part epoxy: a very strong, chemical-resistant finish for busy or demanding floors.
- Two-part polyaspartic: cures in hours rather than days and won't yellow or fade in sunlight, so areas can be back in use fast, even where the floor is exposed to UV.
Floor symbols that stay sharp
Pedestrian symbols, arrows and safety signs go down through a fresh, single use stencil onto shot blasted concrete, in a primer and hand applied two part epoxy, with a polyaspartic top coat as an upgrade for sites that need something harder wearing. Custom stencils are available for bespoke designs.
See every step with photos in how we apply bespoke floor stencils.
Not sure what your site needs?
We'll come to your site for free and walk it with you. We look at how people, forklifts and lorries actually move around, then suggest where walkways, crossings, hatching and forklift zones should go.
- A walk round your floor or yard with you or your health and safety lead
- Clear suggestions for routes, crossings and keep-clear areas
- A detailed quote based on what we've seen, with no obligation
It's the easiest way to get a layout that fits how your site really works, rather than one guessed from a drawing.
Enquire about this service
Fill out this form and we'll be in touch.
Prefer to chat to a member of the team?01603 905 022Frequently asked questions
Will you need to shut down the warehouse for the works?
Not usually. We can work in zones so the rest of the warehouse keeps running, and plan the order of work around your busiest areas.
Do you work out of hours?
Yes. We can work evenings and weekends so the floor is ready when your team is back in.
Can you mark a floor that's already had markings installed?
Yes. We check what is already on the floor first. Where old markings or coatings are failing, we grind them back so the new system bonds to the floor rather than to the old paint.
How long will the markings last?
It depends on the system, the floor and the traffic it takes. A two-part epoxy or polyaspartic system on a properly prepared floor will last far longer than a single-part paint in a busy forklift area. We'll talk you through the options when we quote.
How long until the markings can be driven on?
It depends on the system you choose.
An acrylic can be used within hours of being installed, but a two-part system may take 24 hours to cure and need multiple coats.
We'll talk you through the trade-off between curing time and how long the markings last.
Do you guarantee your work?
Yes. All our markings come with a 12-month workmanship warranty. We prepare every surface properly before we mark it, so we're happy to stand behind the work.














