Measure twice, mask once, then paint
Good sports hall lines come down to three things: an accurate layout, a sharp masked edge and a tough finish over the top.
Here is how we do it on a typical school or leisure centre hall, whether it is a brand new timber floor or an older one that needs its courts remarking.
Step 1
Survey and layout drawing
We measure the hall and agree which courts you need, for example badminton, basketball, netball, volleyball and five-a-side.
Each court is drawn to the right size for its sport, with as much run-off as the hall allows. Where courts overlap, we check every line can still be read clearly before anything goes down.
Step 2
Preparing the floor
The floor is cleaned so there is no dust or grease. On an existing lacquered floor, we lightly abrade the surface along each line so the paint has something to grip.
On a new timber floor, the line paint goes onto the base coat of lacquer, ready for the final coats on top.
Step 3
Setting out
Every court is set out from fixed points in the hall, then checked across the diagonals so it is square. Centre lines, circles and arcs are measured from the same points, so all the courts sit true to each other and to the walls.
Step 4
Taping out
During the setting out, we pull a long string line tight down the full length of the court. The tape applicator follows that line, so we can lay long runs of tape very quickly and keep them dead straight.
It lays two strips of masking tape at once, at exactly the width of the line, so every straight line is the same width from one end of the hall to the other. Most court lines are 50mm wide, and badminton lines are 40mm.
Curves are masked by hand. Every edge is then pressed down and sealed so the paint cannot creep underneath.
Step 5
Painting and finishing
Each line is rolled in a paint made for sports floors, in the colour for that sport. On a timber floor we usually put two coats down in one day, then the tape comes up to leave a crisp edge and the paint is left 24 hours to cure.
After that, a lacquer topcoat goes over the floor to seal the lines in, so they stand up to trainers, chairs and cleaning. It is best to leave the floor another 24 to 48 hours before it is used. Timings vary with the paint, so we confirm them on your quote.
Talk to us about your hall
We mark sports halls for schools, colleges, leisure centres and clubs across Norfolk, Suffolk, Cambridgeshire and Essex. See our sports court markings service, or our guide to school playground marking ideas.
Need your sports hall marked?
Tell us about your site and we'll be in touch.
Prefer to chat to a member of the team?01603 905 022Frequently asked questions
How long does it take to mark a sports hall?
On a timber floor, the line paint usually goes on in two coats in one day and is left 24 hours to cure. The lacquer topcoat goes on after that, and the floor is best left another 24 to 48 hours before it is used. It varies with the paint and the number of courts, so we plan around term time and bookings and confirm the timings on your quote.
Will the paint bleed under the tape?
Not when it is done properly. We use a fine line masking tape, press the edges down firmly and seal them before painting, so you get a sharp edge rather than a fuzzy one.
Can you add new courts to a floor that is already marked?
Yes. We set the new court out around the existing lines, using a different colour so each sport stays easy to read.
Which colours do the different sports use?
There is no single rule, but common choices are white for badminton, black for basketball, red for netball, green for volleyball, blue for five-a-side and yellow for tennis. We agree the colours with you before we start.
Do you work on synthetic and vinyl sports floors too?
Yes. The setting out and masking are the same. We just choose a paint and finish that suit the floor.













